What is Feed-in Tariffs (FiT)?

The FiT is Malaysia’s new mechanism under the Renewable Policy and Action Plan to catalyze generation of RE, up to 30MW in size. This mechanism allows electricity produced from indigenous renewable energy resources to be sold to power utilities at a fixed premium rate for a specific duration.

Q:

A:

How to become a Feed-in Approval Holder?  

In order to be entitled to sell renewable energy at the Feed-in Tariff (FiT) rate, a Feed-in Approval (FiA) will have to be applied to and granted by SEDA Malaysia. The application for the FiA can be done either manually or online via SEDA Malaysia’s official website. Application forms will be made available on SEDA Malaysia’s website and hard copies will be made available at SEDA Malaysia’s office. There is no preferential treatment for FiA applications. Instead all FiA applications will be treated fairly and equally through a transparent application process. An online FiA application system will be made available.